What we'd build · Construction

ConstructionZoid

GC project ops — submittals, RFIs, and change orders for crews who'd rather be on site.

Sample build ← All industries
ConstructionZoid · Project Dashboard
Sample data Preview
Active projects
14
3 closing this month
RFIs open
38
7 past due
Change orders
$1.84M
11 pending GC sign-off
Safety days
142
since last lost-time

Active projects

By margin-at-risk
JobPhaseScheduleBudgetRisk
Maple Ridge Medical Office Drywall & MEP rough +4 days 92% drawn Schedule slip
Harbor 41 Mixed-Use Foundations On track 38% drawn On track
Westvale High School Reno Pre-construction +1 day 4% drawn Permit
Linden Logistics Tilt-Up Punch & closeout −2 days 96% drawn Closing
Tap into a job to drill into RFIs, submittals, and change orders. Open RFI manager →

RFI #2014 — Maple Ridge Medical Office

Awaiting architect · 3 days open
Mechanical · DX-3 fan-coil
Frank Delacroix · MEP super
M-401 detail 7
~$28,400 if alternate path approved
Routing on M-401/7 conflicts with sprinkler main installed last week. Can we drop the duct 6" or reroute east of column line C? Photo attached.
Drawing reference Cost impact Discipline Schedule risk
Approving here drafts the change order automatically. Continue to change orders →

Change order log — Maple Ridge Medical Office

11 entries · $384,210 net
#DescriptionSourceAmountStatus
CO-014 Reroute DX-3 ductwork (RFI #2014) RFI $28,400 Owner review
CO-013 Storefront upgrade — laminated glazing Owner request $72,800 Executed
CO-012 Subgrade rock — east footing Field condition $41,950 Executed
CO-011 Restroom finish swap to porcelain Designer $18,300 Drafted
CO-010 Generator pad relocation RFI $11,420 Executed
In the real app we'd build for you, every CO is wired to its RFI, submittal, and dependency chain. Continue to submittals →
Open submittals
62
9 awaiting architect
Avg. round-trip
8.4 d
▼ 1.2d vs. last project
Long-lead at risk
3
Switchgear · curtain wall

Submittal log — Maple Ridge Medical Office

CSI division · status · turnaround
#ItemSpec sectionStatusReturned
S-1841 Mechanical switchgear · 480V/4000A 26 13 13 Architect review Day 12 of 14
S-1840 Curtain wall mock-up 08 44 13 Approved as noted Apr 22
S-1839 Cold-formed metal framing shop drawings 05 40 00 Approved Apr 18
S-1838 Operating room flooring · seamless vinyl 09 65 36 Rejected · resubmit Apr 15
S-1837 Plumbing fixtures · accessible group 22 40 00 Field sample requested Apr 11
Long-lead items are flagged against the schedule before they bite. Continue to safety →
OSHA recordables
0
90 days clean
Toolbox talks · WTD
14
98% attendance
Open observations
7
2 high · 5 med
JHA on file
36
All trades current

Recent observations

Field-captured · last 7 days
Unguarded floor opening · level 3 west — corrected same shift High
Missing trailing-edge fall arrest · roof crew Med
Housekeeping · debris on stair tread, level 2 Med
PPE compliance walk · all trades 100%

Inspection schedule

Next 14 days · jurisdictional
Apr 30 · 10:00
Building dept · framing rough
Levels 1–3 · superintendent on site
May 02 · 14:00
Fire marshal · sprinkler riser
Hydrostatic test scheduled morning of
May 05 · 09:00
Health dept · medical gas rough
NFPA 99 brazing certs uploaded
May 09 · 11:00
Owner walk · finishes mock-up
Architect, designer, owner rep
Every observation auto-links to a JHA, training record, and corrective action. Continue to closeout →

Punch & closeout — Linden Logistics Tilt-Up

96% complete · TCO targeted May 12
38 of 412
21 of 24 received
In redline · architect 30%

Closeout checklist

Substantial completion certificate signed Apr 18
Lien waivers · 100% of subs through 4/15 On file
Owner training · BMS, fire alarm, MEP 2 of 4 scheduled
Warranty letters · 12-month standard Drafted
Final TCO · jurisdictional sign-offs Targeting May 12
Every closeout artifact is hash-chained, exportable, and ready for owner handover.

This is a sample of what we'd build for a Construction business — hand-crafted UI with sample data, no real engine running. The actual app we'd ship for you uses your folders, your branding, and your domain. Schedule a walkthrough to see a tailored version.